Anonymous ID: 81f7d0 Fuck You July 17, 2022, 11:05 a.m. No.16751359   🗄️.is 🔗kun

The Geneva Tunnel

Although only conjecture, it’s highly likely that Genova, Italy marks the entrance of a 275 kilometer (170 mile) subterranean tunnel which allows submarines emanating from Greenland to access CIA Headquarters beneath Lake Geneva. This notion is corroborated by the fact that Geneva (G+N+V) and Genova (G+N+V) are consonantly the same name which suggests that the “Geneva Tunnel” may in fact be the tunnel’s official name. The flag of Genova and the coat of arms of Genovabear a Roman cross similar to the flag of Switzerland and identical to the logo of the Red Cross which is coincidentally headquartered in Geneva, Switzerland. In other words, the names and symbols associated with the Genova are in essentially Swiss. Interestingly, back in 1946, a colossal drilling project was initiated to carve a tunnel through the base of Mont Blanc, the highest mountain in the Alps. Said project eventually became known as the Mont Blanc Tunnel which would ultimately connect Chamonix, France, with Courmayeur, Italy. Considering thatCERN

was publicly founded on September 29, 1954, it appears that the Mont Blanc Tunnel may have been the cover project for the construction of the Geneva Tunnel between Genova and Geneva. In the event that both tunnels were being built simultaneously, any and all tunnel-related seismic-like activity from the Geneva Tunnel would naturally be blamed on the building of the Mont Blanc Tunnel. The notion that the Mont Blanc Tunnel was cover for the Geneva Tunnel is corroborated by the fact that the Mont Blanc Tunnel took 20-years to complete, despite being only 11.611 kilometers (7.215 miles) in length. Conversely, theGotthard Base Tunnel, which includes 151.84 km (94.3 miles) of tunnels, also took 20-years to complete. The argument that improvements in technology is ultimately responsible for the more than tenfold increase in the tunnel’s completion rate, consider this: the Simplon Tunnel beneath the Swiss-Italian Alps was under only construction for 9-years (1912 to 1921) and is 39.524 kilometers (24.5591 miles) in length. Therefore, the 20-years construction of the 11.611 kilometers (7.215 miles) Mont Blanc Tunnel suggests that it was construction cover for the construction of the Geneva Tunnel which is located directly to the east of it. The notion that a base-level tunnel could be bored 275 kilometers (170 miles) beneath the Alps is supported by the fact that of the world’s longest and deepest known tunnels, Switzerland is home or party to at least 11 of them, totaling 315.937 kilometers (196.314 miles) in length. These tunnels include but are not limited to: theGotthard Base Tunnel (57.104 kilometers), the Mont d’Ambin Base Tunnel (57 kilometers), the Ceneri Base Tunnel (39.8 kilometers), the Lötschberg Base Tunnel(34.57 kilometers), the LEP Tunnel (26.659 kilometers), the Simplon Tunnel (19.824 kilometers), the Vereina Tunnel (19.058 kilometers), the Gotthard Road Tunnel(16.9 kilometers), the Furka Base Tunnel(15.407 kilometers), the Gotthard Tunnel(15.003 kilometers), and the Lötschberg Tunnel (14.612 kilometers).

 

The Geneva Tunnel system connects to the VATICAN tunnel systems which houses over 60 miles of Books/under ground libraries hidden from society and including 54 hidden books originally part of the Great Bible.

 

These tunnel systems connect to through Europe to the middle east and up through Ukraine into Sweden and up to the North Poles under ground bases.

 

Since the beginnings of 2014 MILITARY operations have targeted and destroyed vast networks of the under ground Tunnels systems. In 20(17) Full operations began to destroy the world tunnel systems and free those born in the dark and bring an END to the DEEP STATE empire that stretch back thousands of years to biblical accounts of demons, devil's and serpent people who were born in the under worlds.