>>18572 (PB)
The AC units are broken. Junk.
Where are the mounting points for the dome?
If Epstein is such a rich-ass guy, why didn't he do the repairs after the hurricane? It's been a while.
There IS NO AC inside and the interior was being remodeled. Did the roof leak? If this building is so central to the activities on the island, why have repairs dragged on so long?
This raises a lot of questions.
Is Epstein even able to pay his contractors?