It looks like the bracket "/" before 4 in the second date, makes it /4-5/17 with the month omitted.
It looks like the bracket "/" before 4 in the second date, makes it /4-5/17 with the month omitted.
Ink dating is a thing. Maybe the document has already been tested and a perjury trap is being laid…