<<15169087 pb notable
because authorities have the lot numbers - this gives them: factory manufactured at, manufacture date, production line and time (thus knowing which people were working), and they will know if the bill of materials was altered (systematically or on the fly).
Specifics about the details of manufacturing facility will tell us a lot.