PEDOdiddyIs seen pacing at the Miami airport walking around after his homes were raided
It only take5 daysand between $200-$600 to become a Board Certified vessel pilot
WOW
>https://onestop.md.gov/licenses/pilot-license-5d1540c954f24d03e9998b10
Maryland OneStop Homepage
Pilot License Details
Pilot License
General Info - Statewide License
The State Board of Pilots licenses and regulates pilots who pilot vessels on the navigable waters of the State of Maryland.
Agency Contacts:
Zevi Thomas, Executive Director
410-230-6262
Noraida "Neng" Lozano, Administrative Specialist III
410-230-6261
5 days
Approval time
$200.00 - $600.00
Application cost
expect more "attacks" in the coming days
It appears there were multiple electrical lines
Key Crossing Reliability Initiative
The study determined two viable options: jet plowing submarine cables or constructing an overhead transmission line. After discussions with regulatory agencies, BGE selected the overhead project as the preferred option for the following reasons:
Environmental sensitivity: the overhead option's environmental impacts would be a fraction of those generated by jet plowing submarine cable through the river bottom
Cost savings: building underground cables would cost approximately twice as much as the overhead option
Economic impacts: installing overhead lines would have limited impacts on the Port of Baltimore operations compared to the underground option which would significantly impact port operations
Workforce development: the overhead option has the greatest potential for local and domestic job creation
New overhead lines will replace the Key Crossing underground segmentand will connect with theexisting overhead system. The Patapsco River is approximately 2 miles wide where the overhead lines will be placed.
From May through September 2021, BGE will construct eight transmission towers; five towers will be erected in the Patapsco River and equipped with water-level structures to provide protection from potential water-traffic collisions. The additional 3 towers will be land based with 1 on the Hawkins Point side of the river and 2 on the Sollers Point side.
>https://www.bge.com/smart-energy/innovation-technology/reliability-improvements/key-crossing-initiative