Yeah. It's all big dollars any way you slice it. Thank you for continuing the discussion I don't know how to do that between breads. I was thinking T100 steel would be a lot harder to cut but that is BIG money. Concrete could be made with mostly local dirt and gravel with a huge mobile batch plant or 20. I've actually got a couple of designs committed to paper in the form of rough drawings.
I almost want to quit my job and move to where this work is going to go on at. I want to be involved.