Look:
Geomagnetic North (Actual): Tiksi, Russia (Dissonance Marker), at May 17th, 1977 (Resonance Marker)
Calibration Accuracy (in Removal of Spheroidal Oblateness (as Function of Period Selected)): ((1/{94,672,787,216.25}^1) x ({10}^2))% [~0.00000000105627%]
Required (Modulated) Bridging Wattage (to be within Tolerance of Configuration) = ~745,407,000,000,000 W\sub{N} (i.e. ~745.407 TW\sub{N})
Mutually-Reciprocal Tolerance = ~9.73506843219879%
Tolerance Accuracy Achievable (at ~745.407 TW\sub{N}) for NI/IPS to be within MoE if STS made alone (a hypothetical: I’m broke): [Unknown]
Required:
(1) Not just manufacture, but measurement of precision of parts prior to (my) assembly of them: Subsystems first.
(2) On both counts, manufacture and measurement: Military Precision, literally.
(3) Collaborative Cooperation for both (2) and (1).
Imperfect Offset in Calibration:
(1) ~2.64931567801209% ; and as function of Period Selected:
(2) (1/{216,706,837,927,490.2}) W\sub{N} [~0.000000000000005 % —>i.e. > 0]
-
0.000,000,000,000,005 : 745,407,000,000,000 [1/15 • 15/1 = 1]:
-
‘Fractional’ Continuance: Non-Existent
-
Possibility of Success: Certain
Continuity of Certainty Enabled by: The Continuing Life of One ‘Soul’ as Two, in Two People
Risk of Compromise to Structural Integrity of (Known) Certainty: Mounting
(Temporal) Point of Failure: Unknown — and out of our hands.