CERN
Verified account @CERN
15h15 hours ago
This video shows elements of the new 400-kV BE2 electrical substation located in Prévessin and connected to the French grid.
https://twitter.com/CERN/status/1221809586631532544
CERN
Verified account @CERN
15h15 hours ago
This video shows elements of the new 400-kV BE2 electrical substation located in Prévessin and connected to the French grid.
https://twitter.com/CERN/status/1221809586631532544
Kek. There was no video link in the twat so it when I went to copy/paste it used the previous link. Sorry about that.
https://nypost.com/2020/01/23/mta-transit-chief-andy-byford-resigns-after-two-years-on-the-job/