In memoriam: Mar 11, 2011
>Fukushima
About 170 tons of water is contaminated every day at the Fukushima plant as it is poured onto the wreckage to cool the melted fuel that remains on-site or as it passes through the complex as groundwater.
Tanks used to store the treated water are expected to reach capacity by summer 2022.
https://www.japantimes.co.jp/news/2020/02/03/national/japan-embassies-fukushima-water-ocean/