Anonymous ID: fdb39f July 17, 2020, 10:15 p.m. No.9995558   🗄️.is 🔗kun

Chinese operatives are preparing to carry out a controlled demolition of the 3GD in an effort to control the situation; to remove any uncertainty from the otherwise natural, albeit inevitable, collapse.

 

Intel strongly asserts that the decision was made “at the very top” to demolish the dam, giving credence to HUMINT interactions claiming that the Chinese Government would rather not prolong what was essentially guaranteed and to retain control of the situation on their own terms.

 

SIGINT recently discovered massive late night shipments of chemicals from plants known to manufacture medical-grade iodine and chlorine-based prophylactics, with destinations that corroborate intel that highly suggests the 3GD will fail.

 

Orbital surveillance satellites that have recently been launched with classified equipment on board have returned data that indicates that nuclear material from most major sites downriver of the dam have been moved and stored inside a mountain structure.

 

Orders are being prepared by the President of China and the President of the United States of America to absolve debt in return for an emergency path to US citizenship for those affected by the eventual catastrophe, whose numbers may reach into the hundreds of millions. Canada, Russia, and the Korean Peninsula are currently communicating to decide if each respective entity were willing to assist in an emergency migration of displaced Chinese citizens.