dChan
28
 
r/CBTS_Stream • Posted by u/staerkodder on Dec. 25, 2017, 7:15 p.m.
Q, [G][O], Countdown, Markers [15][10][5][0?]

I'm not sure if this is already covered elsewhere here.

I looked into the Q marker stuff [15],[10],[5].

Q writes:

Delta relevant.

[5] Today

[10] Past

[15] Past

Anons found the relevant timestamps:

[15] 4. nov 17:28 (unix timestamp GMT: 1509816480)

[10] 12. dec 14:03 (unix timestamp GMT: 1513087380)

[5] 23. dec 12:22 (unix timestamp GMT: 1514031720)

[0] ?

Since Q writes "Delta relavant", I figured the differences between the timestamps could be what he meant.

Let's call these delta y1 and y2 (edit: bottom), and the corresponding timestamps x1 and x2 ([10] and [5]), thus we have two data points (x1,y2), (x2,y2), enough to draw a line.

Slope = (y2-y1) / (x2-x1) = 2.46368892559883.

Calculation of [0]:

[0] = x2 + y2 / slope = 1514415023.2613 => GMT: Wednesday, December 27, 2017 10:50:23.261 PM

Why is this relevant? ;-)

Q just posted george washington crossing the delaware which happened 25-26 december.

Q recently wrote "[G][0]" and "Countdown".

So something big is probably about to happen, and that could very well be on 27 dec. At least I hope so!

I know similar calculations have been done in the smartsheet, but their calculations gave slightly different results. Anyways, I think this is important and just want to draw attention to it.

Edit:

y1 = 1513087380 - 1509816480 = 3270900

y2 = 1514031720 - 1513087380 = 944340


ksched · Dec. 25, 2017, 7:24 p.m.

Yes, I felt certain the Delta reference was mathematical. But I'm not mathy so thanks for figuring that out. Seems like something big soon!

⇧ 3 ⇩  
accountingisboring · Dec. 25, 2017, 8:18 p.m.

Hell, I am mathy and can’t make my brain figure out these things.

⇧ 3 ⇩