Anonymous ID: 291cf1 Feb. 17, 2021, 7:14 a.m. No.58632   🗄️.is 🔗kun   >>8636 >>8638 >>8651 >>8659 >>8684 >>8707

Been trying to post this for 40 minutes now….phonefaggin at work…watching grid

 

Word from higher up, rolling into stage 3 of energy shedding at 0900 central….which was 14 minutes ago.

 

Have a list of what breakers are going to be opened but that seems to get deviated from, at least these last 2 days.

 

All we know is outages are to be 30-60 minutes long, typically they last on average around 70-80 minutes. Longer if breaker has mechanical/electrical issues closing back in.

 

Yesterday we dropped out of stage 3 around 1030 but had been in stage 3 since 0700.

 

We are over producing 500+ megawatts of our firm load but still having to perform rolling blackouts. Wish I could see generators of other states.

 

spp.org for more public info on SOUTHERN POWER POOL

 

I will update when I can, busy day at power company

Anonymous ID: 291cf1 Feb. 17, 2021, 7:55 a.m. No.58651   🗄️.is 🔗kun   >>8659 >>8684 >>8707

>>58632

 

Update, rolling into stage 3 was postponed. SPP loads seemed to have peaked and are right on threshold of stage 3 criteria. Should remain in stage 2(no rolling blackouts) as long as demand doesn't spike and as long as no major generation is lost.

 

Did not see any load shedding from opening breakers since last update.

 

Remain in stage 2